Scope of work includes as follows but not limited:
- Engineering, supply and construction, testing, pre-commissioning of the full scope:
- Engineering of design, fabrication detail drawings (KMD) and marking plans
- Procurement of raw materials
- Fabrication of steel structures
- Sandblasting and painting of fabricated goods
- QA/QC inspections (non-destructive examination, shop-testing, QA/QC reports prior to deliver all inspected items.
Project goal:
- Fabrication of Structural Steel
Production capacity:
Place of project implementation:
Timeline:
- June 2015 — June 2016 (10 Months)
Client: