KEY SUCCESS FACTORS:
- Maximum Local Content: Achieving the highest possible local content for modules, temporary refuges, local equipment rooms, process and utilities buildings.
- Pioneering Achievement: Being the first local contractor to be awarded a multidisciplinary Engineering, Procurement, and Construction (EPC) contract for offshore applications, meeting the highest quality standards in the Oil & Gas industry.
- Timely Delivery: Successfully delivering the project on time and without any punch list items, ensuring smooth operations post-completion.
- Internal Resource Management: Managing the entire project cycle internally, from feasibility studies to on-site supervision and installation, optimizing cost and performance throughout.
- Strategic Location: Establishing facilities in a strategic position in Atyrau and designing them to accommodate all modular solutions effectively.
Project Goal:
Procurement and fabrication of offshore buildings in-country, meeting the requirements of Isker.
Production Capacity:
The project aims for a production capacity of 300 tons per month.
Place of Project Implementation:
The project is to be implemented in the Atyrau area.
Timeline:
The project is scheduled from October 2009 to December 2011, spanning 27 months.
Client:
Isker
Scope of Work:
Fabrication of steel structures for offshore modular buildings, local equipment rooms, superstructure for metal buildings, etc. The structural steel portion of the project amounts to 3000 tonnes.