Procurement and Fabrication of Offshore Buildings - In Country

KEY SUCCESS FACTORS:

  1. Maximum Local Content: Achieving the highest possible local content for modules, temporary refuges, local equipment rooms, process and utilities buildings.
  2. Pioneering Achievement: Being the first local contractor to be awarded a multidisciplinary Engineering, Procurement, and Construction (EPC) contract for offshore applications, meeting the highest quality standards in the Oil & Gas industry.
  3. Timely Delivery: Successfully delivering the project on time and without any punch list items, ensuring smooth operations post-completion.
  4. Internal Resource Management: Managing the entire project cycle internally, from feasibility studies to on-site supervision and installation, optimizing cost and performance throughout.
  5. Strategic Location: Establishing facilities in a strategic position in Atyrau and designing them to accommodate all modular solutions effectively.

Project Goal:

Procurement and fabrication of offshore buildings in-country, meeting the requirements of Isker.

Production Capacity:

The project aims for a production capacity of 300 tons per month.

Place of Project Implementation:

The project is to be implemented in the Atyrau area.

Timeline:

The project is scheduled from October 2009 to December 2011, spanning 27 months.

Client:

Isker

Scope of Work:

Fabrication of steel structures for offshore modular buildings, local equipment rooms, superstructure for metal buildings, etc. The structural steel portion of the project amounts to 3000 tonnes.